Transport

Adelaide City Tramline
Adelaide EastLINK City Tramline Extension

Contract Period:

Februrary 2017 - Present

York Civil has been awarded the contract to construct the long-awaited Adelaide EastLINK City Tramline Extension along North Terrace. The one-kilometre extension is the beginning of the CityLINK loop around the Adelaide CBD, and forms Stage One of planned EastLINK…

Dignams Creek Upgrade

Contract Period:

December 2016 - current

The Dignams Creek Upgrade project comprises the construction of roadworks, bridgeworks and associated works of a 2.9km section of rural carriageway on the Princes Highway, approximately 26km south of Narooma. The upgrade includes construction of 2.1km of new carriageway along a new…

Techport CUF Wharf Extension

Contract Period:

June 2016 - November 2016

The Common User Facility (CUF) is located within Techport Australia, South Australia’s maritime precinct. A state owned facility, CUF consists of a shiplift, wharf, ship transfer system and dry berth for ship building and ship maintenance activities, and supports the Commonwealth and…

Adelaide Freight Terminal Office Upgrade

Contract Period:

May 2016 - December 2016

York Civil was awarded office upgrade works at the Adelaide Freight Terminal after successfully completing phase one of the terminal upgrade. The scope of works for the Office Upgrade includes the refurbishment of three existing office buildings and demolition of…

Upgrade of Marion/Sturt Road Intersection

Contract Period:

October 2015 - February 2016

York Civil was awarded the contract for the upgrade of the intersection of Marion Road and Sturt Road to be undertaken for the Department of Planning, Transport and Infrastructure (DPTI) as part of the North-South Corridor Darlington Upgrade. The upgrade included;…

Broome Wharf Extension of Life

Contract Period:

June 2015 - September 2016

York Civil was awarded the design and construct contract to significantly renovate the Port of Broome wharf. The Port of Broome is the principal deep water port servicing the Kimberley region, and is a critical logistics node which significantly contributes to…

Fremantle Road and Rail Bridge Strengthening

Contract Period:

March 2015 - May 2016

York Civil was awarded the contract for pier strengthening works at Fremantle’s traffic and rail bridges over the Swan River in Western Australia. The works on the two bridges, which will protect the traffic and rail bridges in case of…

Swan River Pedestrian Bridge Impression
Swan River Pedestrian Bridge

Contract Period:

June 2015 - current

The Swan River Pedestrian Bridge Project is a high-profile piece of public infrastructure that will be a landmark example of design excellence, commensurate with the strategic importance of the project and consistent with Western Australia’s commitment to high design quality…

Torrens to Torrens Roadmap
Torrens Road to River Torrens

Contract Period:

May 2015 - current

The Torrens Road to River Torrens upgrade is designed to cater for more than double the volume of traffic, improving travel times and reducing congestion at major intersections. The State and Commonwealth government have contributed $896 million to the construction…

Adelaide Freight Terminal Stage 1

Contract Period:

March 2015 - October 2015

The Adelaide Freight Terminal (AFT) is located in Regency Park, approximately 10km north of the Adelaide CBD, and was constructed in the 1980s. Apart from minor changes, the Terminal has not been upgraded or refurbished since and sections of infrastructure, particularly track and…

Woolgoolga to Halfway Creek – Pacific Highway Upgrade

Contract Period:

December 2014 - current

Funded by the Australian and NSW governments, the Pacific Highway Upgrade is the largest road infrastructure project in NSW, progressively turning the highway into a four lane divided road spanning Hexham to Queensland. York Civil has been awarded the contract…

Marino Rocks Greenway ANZAC Highway Underpass

Contract Period:

July 2014 - November 2014

The Marino Rocks Greenway provides a safe, direct, continuous and attractive link from the City to the southern suburbs of Adelaide. The underpass beneath the heavily trafficked Keswick Bridge connects the existing Anzac Hwy/West Tce shareduse path in the Adelaide Parklands with the existing path adjacent…

Schofields Road Upgrade and Extension Stage 2

Contract Period:

June 2014 - current

Stage 2 of the Schofields Road Upgrade and Extension between Tallawong Road and Veron Road will offer a major east-west link from Rouse Hill to Marsden Park for motorists travelling in North West Growth Centre. The works are situated in the…

Hay Point Expansion Project – Phase 3 Onshore Civil Works

Contract Period:

May 2014 - December 2015

The expansion of the Hay Point Coal Terminal was designed to increase terminal output and operational flexibility, and will increase capacity from 44 mtpa to 55 mtpa. York Civil was awarded the contract for the final civil works onshore. Scope…

Dysart Road Infrastructure Relocation

Contract Period:

March 2014 - November 2014

This project encompasses the relocation of a section of Peak Downs Mine Road to allow for the expansion of the Peak Downs Mine. York Civil was awarded the contract to construct the new 16km road with a 9m wide sealed surface…

North Quay Rail Terminal Stage 2

Contract Period:

August 2013 – November 2014

This project involved extending the North Quay Rail Terminal from 400m to 690m with the aim of increasing capacity to transport goods by rail, and reducing truck traffc to and from the port by improving accesses for container transfer on…

Brisbane Terminal Redevelopment

Contract Period:

June 2012 – February 2014

The redevelopment of the existing DP World Terminals 4 to 7 at Fisherman lslands has enabled the mode of terminal operations to change from forklifts to automated stacking cranes, and redeveloped a container yard and associated facilities and services. Specific…

Fitzroy Region Damage Repair Works

Contract Period:

March 2013 – December 2013

As a result of monsoonal rain, tropical cyclones and floods across some areas of Queensland in 2010, the Department of Transport and Main Roads’ network of roads sustained an unprecedented level of damage. York Civil was engaged to undertake the…

Tablelands Pavement Rehabilitation and Reconstruction

Contract Period:

April 2013 – November 2013

York Civil was awarded the contract for road pavement rehabilitation and reconstruction works within the Cairns, Cassowary Coast and Tablelands Regional Council districts. The scope of works included construction of culverts, reshaping water tables, stabilised pavements, unbound pavements, chip seal…

Goodwood Junction Rail Grade Separation

Contract Period:

October 2012 – October 2013

The Goodwood Junction Grade Separation Project comprised grade separations at two existing at-grade freight and passenger rail junctions, construction of a new rail bridge over lowered rail tracks, a new road bridge on Victoria Street and realignment of Brownhill Creek. The scope…

Bruce Highway Bowen to Ingham Road Restoration

Contract Period:

April 2013 – September 2013

York Civil was engaged to undertake the repair and rehabilitation of the Bruce Highway Bowen to Ingham Road network after the tropical cyclone and flood damage in 2010. The reconstruction works involved profiling existing seal and pavement, cement stabilisation, resealing,…

Rail Revitalisation Adelaide
Rail Revitalisation Project Stages 2, 2A, 4 and 5

Contract Period:

May 2010 – June 2013

The Rail Revitalisation project comprised upgrade works to the Oaklands to Noarlunga Line, the Mawson Lakes to Gawler Line, the Adelaide to Oaklands Line and the Adelaide Yard. York Civil worked with the Department for Planning, Transport and Infrastructure to develop…

Caval Ridge Buffel Park Intersection

Contract Period:

September 2012 – November 2012

York Civil undertook construction of an intersection on the Peak Downs Highway in Central Queensland for the turn off to Caval Ridge Coal Mine’s Buffel Village construction camp. Works included turn-in and exiting acceleration lanes plus an overtaking lane on the existing…

Elizabeth Station Upgrade

Contract Period:

July 2011 – April 2012

York Civil worked with the Department for Planning, Transport and Infrastructure to deliver the design, construction and commissioning of the new train station at Elizabeth. The upgrade included improved lighting and CCTV surveillance, a fully-enclosed overpass with lifts and stairs,…

Northern Expressway, South Australia
Northern Expressway

Contract Period:

June 2008 - November 2010

The Northern Expressway is a 23km motorway linking the Gawler Bypass with Port Wakefield Road. This project included a four lane expressway, five grade-separated interchanges, a bridge over rail lines, bridges over Gawler River and Gawler Diversion Channel, and a high-speed…

Glengowrie Tram Depot Upgrade

Contract Period:

January 2010 – July 2010

The Glengowrie Tram Depot Upgrade project was initiated to improve the tram depot’s existing infrastructure. The upgrade was necessary in order to accommodate an increase in the existing fleet of six Citadis trams, which required increased stabling capacity, maintenance capability, and operational and…

Yaamba Road Pedestrian Overpass
Yaamba Road Pedestrian Overpass

Contract Period:

January 2009 – April 2010

The Yaamba Road Pedestrian Overpass was designed to enhance pedestrian access and provide a safe passage across the Bruce Highway; the busiest highway in Queensland. York Civil was the principal contractor under an Early Contractor Involvement model for the design and…

ASC Shipyard Redevelopment

Contract Period:

March 2008 – November 2009

The ASC Shipyard Redevelopment project was a $100 million upgrade to ASC’s main facilities at Osborne. York Civil was the main contractor for the project, undertaking the earthworks and pavement construction, as well as the installation of mechanical services. The…

Roxby Downs Township Development

Contract Period:

June 2007 – December 2008

Roxby Downs is located in a remote desert approximately 600km north of Adelaide, South Australia. The expansion was required to cater for a growth from 4,000 to 10,000 residents due to the anticipated Olympic Dam expansion. York Civil undertook all…

Extension to Berth 7

Contract Period:

September 2007 – November 2008

To facilitate an increase in freight volumes through the Port of Adelaide, York Civil was contracted to undertake the extension of Berth 7 at the DP World Facility. The 150m extension of Berth 7, which involved connecting to the adjacent grain berth, enables…

Port River Expressway Stages 1, 2 and 3

Contract Period:

August 2003 – October 2007

The Port River Expressway links South Australia’s major port and rail terminals at Port Adelaide directly with the National Road Network and the interstate mainline rail network. For Stage 1 York Civil was the primary contractor for the construction of…

EastLink Bridges

Contract Period:

February 2006 – September 2007

York Civil was contracted to undertake all construction activities associated with four bridges on the EastLink $2.55 billion project. This included the 10 lane, 55m span bridge over the motorway alignment at Canterbury Road, the dual freeway bridges at Dandenong Creek…

Viterra Terminal Concrete and Pile Cap Construction

Contract Period:

February 2006 – November 2006

The Viterra project involved the construction of a rail in-loading facility, 10 storage silos and a conveyor loading system to the Outer Harbour wharf. The works contributed to Viterra’s expansion of operations to increase their loading rate of barley and wheat…

Holden A1 and B1 Blanking Lines

Contract Period:

June 2005 – December 2005

York Civil was contracted to construct a concrete tunnel for a new pressing plant at Holden Ltd’s car manufacturing facility in Elizabeth, South Australia. The cast in–situ concrete tunnel was 100m in length, 5m high by 5m wide and situated 10m…

Woomera Airbase, Runway and Infrastructure Stages 1 and 2

Contract Period:

January 2001 – February 2003

York Civil was engaged by the Department of Defence to upgrade the Woomera Township, Technical Area and Range E. For Stage 1 the main component was the reconstruction and upgrading of the existing taxiways and aprons at the Woomera Airfield. Works…

Edinburgh Parks Automotive Precinct Stage 1

Contract Period:

January 2001 – December 2001

Edinburgh Parks Automotive Precinct Stage 1 was the beginning of a major manufacturing precinct to support the automotive industry. York Civil was contracted to construct an industrial subdivision which included bulk earthworks, roadwork and pavement construction, stormwater, sewer, water main,…

Blanchetown Bridge
Blanchetown Bridge, Murray River

Contract Period:

December 1996 – November 1998

The Blanchetown Bridge over the Murray River replaced a bridge originally opened in 1964 which was inadequate for B-Double trucks and road trains. York Civil was the primary contractor responsible for project and construction management. Works involved all piling, bridge…

New Brighton Jetty
Brighton Jetty – first incrementally launched jetty

Contract Period:

February 1995 – May 1996

York Civil was awarded the design and construction of a new jetty, which is approximately 200m long plus a jetty head and shore connection. Construction included precast concrete piles, in-situ crossheads with an incrementally launched pre-stressed concrete deck. York Civil was the…