Client:

BHP Billiton Mitsubishi Alliance

Value:

$23 million

Location:

Mackay, Queensland

Contract Period:

May 2014 - December 2015

Hay Point Expansion Project – Phase 3 Onshore Civil Works

The expansion of the Hay Point Coal Terminal was designed to increase terminal output and operational flexibility, and will increase capacity from 44 mtpa to 55 mtpa.

York Civil was awarded the contract for the final civil works onshore. Scope included earthworks, concrete works, stormwater drainage, stormwater pipes, stormwater pumps, roads, surface treatments, line marking and road furniture.

Other works involved general civil works across the site and in the modified in-loading structures, slabs on ground, grated trench drains, concrete structures associated with the in-loading, stockyard, surge bin, stacker-reclaimer facilities, installation of earth grading rings around structures and wash down pit.  The scope also included construction of the seawall and engineered fill.