Projects
- Christies Beach Waste Water Treatment Plant Upgrade
- Environmental Flow Regulator on Chowilla Creek
- Yaamba Road Pedestrian Overpass
- Northern Expressway
- Andrews Farm Wetlands
- Bolivar Waste Water Treatment Plant
- Cathedral Rocks Wind Farm
- Port River Expressway Stages 2 & 3
- Power Transmission for Prominent Hill
- River Murray Improvement Project
- Berth 7
- Township Roxby Downs
Berth 7
The Port of Adelaide is one of the most unique harbours in the world. It functions as the main operating port in South Australia as well as being an urban residential area with significant cultural, heritage and environmental significance.
To facilitate the increase in volumes of freight through the port, York Civil were contracted to undertake the extension of Berth Number 7 at the DP World facility. The 150-metre extension of Berth 7, connecting to the adjacent Grain Berth will enable two Panamax size vessels to berth simultaneously.
